首页> 外文期刊>The Automotive Engineer >NSW Road Train Modernisation Program B-Triple and AB-Triple Operating Conditions
【24h】

NSW Road Train Modernisation Program B-Triple and AB-Triple Operating Conditions

机译:新南威尔士州公路火车现代化计划B级和AB级三级运行条件

获取原文
获取原文并翻译 | 示例
           

摘要

These operating conditions apply to: 1. B-Triples, which are a vehicle combination consisting of a prime mover towing three semitrailers connected by fifth wheel couplings (refer Diagram 1); and 2. AB-Triples, which are a vehicle combination consisting of a prime mover and semi-trailer combination connected, by a converter dolly (with no more than 3 axles), to two semi-trailers which are connected by a fifth wheel coupling (refer Diagram 2).
机译:这些操作条件适用于:1. B型三叉车,是由原动机牵引的三个半挂车组成的组合,其中三个半挂车通过第五个车轮联轴节连接(请参见图1); 2. AB-Triples,是由原动机和半挂车组合组成的车辆组合,通过转车(不超过3个轴)连接到两个半挂车,两个半挂车通过第五轮联轴节连接(请参阅图2)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号