首页> 外文期刊>TEX Energy Report >Cheniere Energy Makes FID on Sabine Pass Train 5
【24h】

Cheniere Energy Makes FID on Sabine Pass Train 5

机译:Cheniere Energy在Sabine Pass Train 5上进行FID

获取原文
获取原文并翻译 | 示例
           

摘要

Cheniere Energy Partners, L.P. on June 30th (local time in the U.S.) announced that it has made final investmentdecision (FID) concerning the project to additionally build train 5 of Sabine Pass Liquefaction Project in Cameron Parish,Louisiana. Train 5 will have capacity of 4.5 million tons per year (up to 5 million tpy). Cheniere instructed Bechtel to startconstruction, which is expected to be completed in the first half of 2018. Bechtel was chosen by Cheniere to provideengineering, procurement, and construction services for new trains at the Sabine Pass LNG terminal.
机译:Cheniere Energy Partners,L.P.于6月30日(美国当地时间)宣布,已就该项目做出最终投资决定(FID),该项目将在路易斯安那州的卡梅隆教区增建Sabine Pass液化项目的5号火车。火车5的年产能为450万吨(年产能为500万吨)。 Cheniere指示Bechtel开始动工,预计将于2018年上半年完成。Cheniere选择Bechtel在Sabine Pass LNG接收站为新火车提供工程,采购和建筑服务。

著录项

  • 来源
    《TEX Energy Report》 |2015年第2898期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号