首页> 外文期刊>TEX Energy Report >Approaching Cyclone Interrupts Again Operation At DBCT-Macarthur Coal declared force majeure-
【24h】

Approaching Cyclone Interrupts Again Operation At DBCT-Macarthur Coal declared force majeure-

机译:接近旋风除尘器再次中断DBCT-麦克阿瑟·科恩的行动宣布不可抗力-

获取原文
获取原文并翻译 | 示例
           

摘要

As the cyclone approaches, operation at Dalrymple Bay Coal Terminal (DBCT) in Queensland, Australia, was disrupted again on 19th. In consequence, Macarthur Coal on the same day declared force majeure on the ground that coal shipments from DBCT became impossible. As reported already, operation at DBCT had been stopped during three days from 13th through 15th March due to bad weather and just on 16th the operation was resumed.
机译:随着旋风的临近,澳大利亚昆士兰州达勒姆普尔湾煤炭码头(DBCT)的运营于19日再次中断。结果,麦克阿瑟煤炭公司在同一天宣布不可抗力,理由是不可能从DBCT运出煤炭。正如已经报道的那样,由于天气恶劣,从3月13日至15日的三天内,DBCT的操作已停止,仅在16日恢复了操作。

著录项

  • 来源
    《TEX Energy Report》 |2010年第23期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号