The Queensland Government's Cleaner Energy strategy is showing results with the planned commencement of a new gas pipeline from the northern Bowen Basin region to Townsville. Construction of the Enertrade pipeline will start in September this year and be completed in late 2004. Enertrade, as part of a consortium with CH4 Pty Ltd and Transfield Townsville Pty Ltd, won the right to provide a gas-fired, base load power station in north Queensland following a competitive selection process. The project will see the existing Transfield-owned Townsville Power Station at Yabulu converted to a combined cycle operation using natural gas as its fuel. Enertrade is a Queensland Government owned corporation. This combined cycle operation will recover waste heat through a steam turbine and increase the station's output to 220 megawatts (MW). At the same time, it will reduce the rate of carbon dioxide emissions by 500 000 tonnes each year when the station is used in place of coal-fired generation.
机译:昆士兰州政府的“清洁能源”战略正在计划中,从北部博文盆地地区到汤斯维尔的新天然气管道的开工计划正在显示出成果。 Enertrade管道的建设将于今年9月开始,并于2004年底完成。作为与CH4 Pty Ltd和Transfield Townsville Pty Ltd的财团的一部分,Enertrade赢得了在美国提供燃气基本负荷发电站的权利。北昆士兰州经过竞争性选拔程序。该项目将把位于Yabulu的现有Transfield拥有的Townsville电站转换为以天然气为燃料的联合循环运行。 Enertrade是昆士兰州政府所有的公司。这种联合循环操作将通过蒸汽轮机回收废热,并将电站的输出提高到220兆瓦(MW)。同时,如果使用该站代替燃煤发电站,它将每年减少二氧化碳排放量50万吨。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号