...
首页> 外文期刊>Quality World >Norman Shields
【24h】

Norman Shields

机译:诺曼·希尔兹

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The story begins in the late 1990s, with a conscientious management consultant conducting very competitively quoted and externally subsidised ISO 9002 quality management projects. The consultant thought that everything was organ-ised but had not, however, reckoned on the cunning of BS, EN and ISO: 'We will change the standard', they cried. 'We'll show those consultants and their clients.' So a committee was formed and, after costly deliberation, the members agreed on a draft standard. The committee planned a first issue date for the newly revised ISO 9000 standard series and everyone made ready for the big day. The issue date passed but the committee decided that it was not important because everyone could still work to the old 9001/2/3 standards. By this time the consultants said: 'Stuff BS, EN and ISO, we know what the numbering and content changes to the draft standard are likely to be. We'll just have to put a cross-reference matrix in our new manuals for now.' And so they did. 'We can still continue to meddle with things and keep those consultants waiting', said BS, EN and ISO committee members, 'but none of the certification bodies can assess to the new format yet so what's the hurry'.
机译:这个故事始于1990年代后期,由一位尽职尽责的管理顾问来进行极具竞争力的报价和外部补贴的ISO 9002质量管理项目。这位顾问认为,所有事情都是有组织的,但没有想到BS,EN和ISO的狡猾:他们哭了“我们将改变标准”。 “我们将向那些顾问及其客户展示。”因此成立了一个委员会,经过昂贵的审议,成员们商定了标准草案。委员会计划了新修订的ISO 9000标准系列的首次发布日期,每个人都为这一重要的日子做好了准备。发布日期已经过去,但是委员会认为这并不重要,因为每个人仍然可以按照旧的9001/2/3标准工作。到了此时,顾问们说:“关于BS,EN和ISO的资料,我们知道标准草案的编号和内容可能会发生什么变化。现在我们只需要在我们的新手册中放置一个交叉引用矩阵。”因此,他们做到了。 BS,EN和ISO委员会成员说:“我们仍然可以继续干预并让那些顾问等待。”但是,没有一家认证机构可以评估新格式,所以有什么急事。

著录项

  • 来源
    《Quality World》 |2006年第6期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号