首页> 外文期刊>Production Planning & Control >Integrated lot sizing and dispatching in wafer fabrication
【24h】

Integrated lot sizing and dispatching in wafer fabrication

机译:晶圆制造中集成的批量计算和调度

获取原文
获取原文并翻译 | 示例
           

摘要

In this article, we investigate the integration of lot sizing and dispatch-related decisions for a wafer fabrication (hereafter referred to as wafer fab) facility. These decisions pertain to the operational planning and shop floor control (SFC) levels of its decision hierarchy. Our objective is to minimise output variability, which is an important and challenging issue for wafer fabrication due to the inherent dynamics and complexity of the operations involved. We propose a detailed lot-sizing model (called dynamic lot release planning (DynaLRP)) that captures wafer movement at each step of the process flow and prescribes a processing quota at these steps as well. We then design a dispatching rule called Largest-Remaining-Quota-First (LRQ) rule to drive wafer movement towards the direction prescribed by the lot-sizing model. A closed-loop control is formed by feeding the shop floor status back to the lot-sizing model and updating processing quota for each processing step on a regular basis. We have tested the effectiveness of our methodology in the simulated environment of a real-life wafer fab, and the results show that our methodology is effective in improving the wafer fab's performance while reducing output variability.
机译:在本文中,我们研究了晶圆制造(以下称为晶圆厂)设施的批量确定和调度相关决策的集成。这些决策涉及其决策层次结构的运营计划和车间控制(SFC)级别。我们的目标是使输出可变性最小化,由于所涉及的固有动态特性和复杂的操作,这对于晶圆制造而言是一个重要且具有挑战性的问题。我们提出了一个详细的批量大小模型(称为动态批量发布计划(DynaLRP)),该模型可以捕获工艺流程中每个步骤的晶圆移动,并在这些步骤中也规定了处理配额。然后,我们设计了一个称为最大剩余配额优先(LRQ)规则的调度规则,以驱动晶圆朝着按批量模型指定的方向移动。通过将车间状态反馈到批量模型并定期更新每个处理步骤的处理配额来形成闭环控制。我们已经在现实的晶圆厂的模拟环境中测试了我们的方法的有效性,结果表明,我们的方法可以有效地提高晶圆厂的性能,同时减少输出的可变性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号