...
首页> 外文期刊>Proceedings of the Workshop on Principles of Advanced and Distributed Simulation >A STEP TOWARD CAPACITY PLANNING AT FINITE CAPACITY IN SEMICONDUCTOR MANUFACTURING
【24h】

A STEP TOWARD CAPACITY PLANNING AT FINITE CAPACITY IN SEMICONDUCTOR MANUFACTURING

机译:在半导体制造中以有限容量进行容量规划的步骤

获取原文
获取原文并翻译 | 示例
           

摘要

Production planning in the Semiconductor Industry (SI) has emerged as the most complex process due to its process complexity, technological constraints and high-mix low-volume production characteristics. In this paper, we present two different production planning approaches, developed by STMicroelectronics and G-SCOP research laboratory, to better control the production in 300mm production line at Crolles. At first, a mixed integer program (MIP) is proposed that projects the production lot trajectories (start and end dates) for the remaining subsequent steps, taking into account finite production capacities. A heuristic is then proposed to simplify the problem of finite capacity by neglecting equipment capacity. This approach results in the development of an infinite capacity WIP projection engine that complies with lots due dates and takes into account cycle time variability.
机译:由于半导体工艺(SI)的工艺复杂性,技术限制和高混合小批量生产特性,它已成为最复杂的工艺。本文中,我们介绍了意法半导体和G-SCOP研究实验室开发的两种不同的生产计划方法,以更好地控制Crolles的300mm生产线的生产。首先,提出了一个混合整数程序(MIP),该程序将有限的生产能力考虑在内,为其余的后续步骤预测生产轨迹(开始日期和结束日期)。然后提出一种启发式方法,通过忽略设备容量来简化有限容量的问题。这种方法导致开发了无限容量的WIP投影引擎,该引擎符合很多到期日并考虑了周期时间的可变性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号