...
首页> 外文期刊>Proceedings of the Workshop on Principles of Advanced and Distributed Simulation >INTELLIGENT BIM-BASED CONSTRUCTION SCHEDULING USING DISCRETE EVENT SIMULATION
【24h】

INTELLIGENT BIM-BASED CONSTRUCTION SCHEDULING USING DISCRETE EVENT SIMULATION

机译:基于离散事件模拟的基于智能BIM的施工调度

获取原文
获取原文并翻译 | 示例
           

摘要

In the last years simulation approaches are increasingly used to support construction scheduling. For that purpose, different kinds of planning data have to be analyzed and integrated to perform realistic and suitable simulation, like building information models, bill of quantities, framework schedules, delivery dates, or available resources. However, a major challenge remains: the efficient specification of realistic and valid interdependencies between construction activities. This specification process is error-prone and often small variations of the input data lead to extensive modifications. This paper presents an intelligent concept to store interdependencies between activities in order to reuse them for handling modifications and different alternatives. Furthermore, the correctness of the interdependencies can be checked and visually highlighted. Finally, a realistic case study is presented to show the advantages of the approach. The approach was developed within the MEFISTO project, supported by the German Federal Ministry of Education and Research.
机译:近年来,越来越多地使用模拟方法来支持施工进度计划。为此,必须分析和集成不同种类的计划数据以执行切合实际的合适模拟,例如建筑信息模型,工程量清单,框架计划,交付日期或可用资源。然而,一个主要挑战仍然是:有效规范建筑活动之间现实和有效的相互依赖关系。此规范过程容易出错,输入数据的微小变化通常会导致大量修改。本文提出了一个智能的概念来存储活动之间的相互依赖关系,以便将它们重用于处理修改和不同的选择。此外,可以检查相互依存关系的正确性并在视觉上突出显示。最后,提出了一个现实的案例研究,以显示该方法的优点。该方法是在德国联邦教育和研究部支持的MEFISTO项目中开发的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号