【24h】

EDITOR'S LETTER

机译:编者的信

获取原文
获取原文并翻译 | 示例
           

摘要

Aberdeen & Grampian Chamber of Commerce has welcomed the Scottish Government's decision to give consent for the development of the European Offshore Wind Deployment Centre (EOWDC). The development consists of 11 wind turbines and their connecting cables, sited between 2 and 4.5 km off the Aberdeenshire coast, potentially capable of generating up to 100 MW, providing enough energy to meet the needs of over 49,000 homes - almost half of the homes in Aberdeen. Wind farms work well, when the wind blows, but there have ben criticisms of its location from many quarters. The positioning of the farm, where many supply ships currently sit awaiting entry to the harbour and where helicopters arrive and depart, is not seen as ideal. It's not clear how much commercial power will be produced, as the farm is designated as a test centre for offshore wind technology.
机译:阿伯丁和格兰屏商会欢迎苏格兰政府决定同意开发欧洲海上风电部署中心(EOWDC)的决定。该开发项目由11台风力涡轮机及其连接电缆组成,它们位于阿伯丁郡海岸2至4.5公里之间,潜在发电能力可达100兆瓦,可提供足够的能源以满足49,000多个家庭的需求-几乎一半的美国家庭香港仔当风吹来时,风电场运转良好,但是许多地方对该风电场的位置提出了批评。农场的定位并不是理想的选择,因为农场的位置目前有许多补给船坐在那里等待进入港口,而直升机则可以到达并离开。目前尚不清楚将产生多少商业电力,因为该农场被指定为海上风能技术的测试中心。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号