...
首页> 外文期刊>Chemical Regulation Reporter >BP Requests Permission to Resume Oil How to Test Failed Alaska Pipeline
【24h】

BP Requests Permission to Resume Oil How to Test Failed Alaska Pipeline

机译:BP要求恢复石油的许可如何测试失败的阿拉斯加管道

获取原文
获取原文并翻译 | 示例
           

摘要

The Department of Transportation is considering a request by BP Exploration(Alaska)Inc.to begin production on an Alaska North Slope pipeline that has been closed since August in order to conduct in-line inspections,a spokesman for the agency said Sept.14.The agency's first priority is the safe operation of the pipeline,DOT's Pipeline and Hazardous Materials Safety Administration spokesman James Wiggins told BNA.He said that a comprehensive review of the application could take at least one to two weeks,or even longer.
机译:运输部发言人9月14日说,运输部正在考虑英国石油勘探公司(BP Exploration(Alaska)Inc。)的要求,开始生产自八月起关闭的阿拉斯加北坡管道以进行在线检查。 DOT的管道和危险材料安全管理局发言人James Wiggins告诉BNA,该机构的首要任务是管道的安全运行。他说,对该应用程序进行全面审查可能至少需要一到两周,甚至更长的时间。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号