机译:Erratum: “Benders decomposition for a period-aggregated resource leveling problem with variable job duration” (Computers and Operations Research (2021) 132, (105258), (S0305054821000502), (10.1016/j.cor.2021.105258))
机译:Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals
机译:Branch-and-cut-and-price for the Electric Vehicle Routing Problem with Time Windows, Piecewise-Linear Recharging and Capacitated Recharging Stations