Scheduling of two-machine flowshop with outsourcing lead-time

机译:Scheduling of two-machine flowshop with outsourcing lead-time

获取原文
获取原文并翻译 | 示例
           

摘要

This paper considers a two-machine flowshop scheduling problem with outsourcing lead-time. While the first operation of jobs can be either processed in-house or outsourced to subcontractors, the second operation of jobs must be processed in-house. Outsourcing a job incurs a job-dependent outsourcing cost as well as outsourcing lead-time, which implies that the outsourced job becomes available for the second operation after its outsourcing lead-time. The objective is to minimize the weighted sum of the outsourcing costs and the scheduling costs which is either makespan or total completion time. The problems are shown to be NP-hard, and both exact and heuristic algorithms are developed for the problems. Finally, computational experiments show that the proposed algorithms provide efficient and effective solutions.

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号