The Gotthard Base Tunnel, at 57km the world's longest railway tunnel, will go into operation in 2016, five years after final breakthrough took place. Since 2009, installation of the railway systems in the tunnel has proceeded in parallel with final excavation and construction work. The first pilot train runs took place in mid-December 2013 at speeds of up to 220km/h on a 13km section between Bodio and Faido. In 2019, the flat route through the Alps is scheduled to be completed with the Ceneri Base Tunnel. More than 70% of the 15.4km under the Ceneri has been excavated so far.
展开▼
机译:全球最长的铁路隧道长达57公里,圣哥达基本隧道(Gotthard Base Tunnel)将于2016年投入运营,距离最终的突破已经过去了五年。自2009年以来,隧道的铁路系统安装与最后的挖掘和施工工作并行进行。第一次试行列车于2013年12月中旬在Bodio和Faido之间的13公里路段以最高220 km / h的速度行驶。到2019年,穿越阿尔卑斯山脉的平坦路线计划与塞内里基础隧道一起完成。到目前为止,在塞内里(Ceneri)下15.4公里下的土地中,已有70%以上被挖掘。