La renovation du pont du Pouzin Demolition et reconstruction complete de la dalle beton et remise en peinture

机译:浦津大桥拆除工程的改造及混凝土板的彻底改造和重新粉刷

获取原文
获取原文并翻译 | 示例
           

摘要

The worrying state of deterioration of the reinforced concrete slab of Pouzin Bridge (Warren girder bridge crossing the Rhone south of Valence) led the local economic players and politicians to give priority to a repair solution involving complete reconstruction. In order to minimise the impact on traffic and on the region's economic activity, engineering work was performed over several months and several projects were produced, leading to a contract award to the GTM-Lassarat-Bonnard consortium upon a restricted invitation to tender and on the basis of an optimised schedule of 3.5 months' complete closure instead of the 8 months planned. Major preparation work and organisation of the project as a whole into various successive tasks enabled the contractors to demolish entirely and then reconstruct the reinforced concrete slab, connected to the steel structure, and to repaint the entire structure, thus succeeding in meeting deadlines.
机译:Pouzin桥(穿过Valence以南Rhone的Warren箱梁桥)的钢筋混凝土板的恶化状态令人担忧,这导致当地经济参与者和政客将涉及完整重建的修复方案作为优先考虑事项。为了最大程度地减少对交通和对该地区经济活动的影响,工程进行了数月,并进行了多个项目,在受邀进行招标和竞标时,授予了GTM-Lassarat-Bonnard财团一份合同。以3.5个月完全关闭的最佳时间表为基础,而不是计划的8个月。整个项目的主要准备工作和组织工作已完成了一系列连续的任务,使承包商可以完全拆除,然后重建连接到钢结构的钢筋混凝土板,并对整个结构重新粉刷,从而成功地按时完成了任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号