首页> 外文期刊>Travaux >Projet Isseane - Chantier des fondations profondes Des fondations complexes, realisees avec des moyens exceptionnels a Issy-les-Moulineaux
【24h】

Projet Isseane - Chantier des fondations profondes Des fondations complexes, realisees avec des moyens exceptionnels a Issy-les-Moulineaux

机译:Isseane项目-深层基础站点Issy-les-Moulineaux用特殊方法制成的复杂基础

获取原文
获取原文并翻译 | 示例
           

摘要

On a site with major constraints, Bilfinger Berger, Soletanche Bachy, Spie Fondations and Sefi are employing exceptional resources to carry out the work entrusted to them by the "SYCTOM" refuse treatment board for the Paris urban area, project manager and Owner of the future Isseane waste sorting and recycling centre. Mining machines, clamshell grab equipment of all sizes and weights, circular buckets, crawler-mounted cranes, drilling machines, etc.: numerous and varied types of equipment are used. They coexist as part of complex logistics and within an extremely tight schedule, with a sole aim : complete on time a set of diaphragm walls and deep foundations of unmatched extent and complexity.
机译:Bilfinger Berger,Soletanche Bachy,Spie Fondations和Sefi在一个受到严重限制的站点上,正利用特殊资源来执行“ SYCTOM”垃圾处理委员会委托给巴黎市区,项目经理和未来所有者的工作Isseane废物分类和回收中心。采矿机,各种尺寸和重量的翻盖抓斗设备,圆形铲斗,履带式起重机,钻孔机等:使用了许多不同类型的设备。它们作为复杂物流的一部分并存,并且在非常紧凑的时间表内并存,其唯一目的是:按时完成一组隔膜墙和无与伦比的范围和复杂性的深层基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号