首页> 外文期刊>Travaux >PROLONGEMENT DE LA LIGNE 14 À SAINT-OUEN LOT T02 -SOUTÈNEMENTS PAROIS MOULÉES -ANALYSES ET OPTIMISATIONS
【24h】

PROLONGEMENT DE LA LIGNE 14 À SAINT-OUEN LOT T02 -SOUTÈNEMENTS PAROIS MOULÉES -ANALYSES ET OPTIMISATIONS

机译:在圣旺T02地段延伸14号线-支持模压墙-分析和优化

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The project for the northward extension of line 14 to Saint-Ouen was launched in 2014, with a view to the desaturation of Line 13 and integration into the future 'Grand Paris' network. Public contracts for the project were awarded under contracting authority RATP and project manager Systra. The consortium formed by Bouygues Travaux Publics, Soletanche Bachy France, Bessac and Soletanche Bachy Tunnels is executing about 2200 m of tunnel from Clichy-Saint-Ouen Station, the civil works for Mairie-de-Saint-Ouen Station and three deep-shaft type structures allowing the TBM to enter and exit. The contract is worth about €165 million and the work duration is 60 months. The station and the shafts include diaphragm walls of optimised design and sizing.%LE PROJET DE PROLONGEMENT NORD DE LA LIGNE 14 JUSQU'À SAINT-OUEN A POUR OBJECTIF LA DÉSATURATION DE LA LIGNE 13 ET L'INTÉGRATION DANS LE FUTUR RÉSEAU GRAND PARIS. LE GROUPEMENT BOUYGUES TRAVAUX PUBLICS - SOLETANCHE BACHY FRANCE - BESSAC - SOLETANCHE BACHY TUNNELS RÉALISE ENVIRON 2200 M DE TUNNEL DEPUIS LA STATION CLICHY-SAINT-OUEN, LE GÉNIE CIVIL DE LA STATION MAIRIE-DE-SAINT-OUEN ET TROIS PUITS PROFONDS PERMETTANT LES ENTRÉES ET SORTIES DU TUNNELIER. LA STATION ET LES PUITS PROFONDS INTÈGRENT DES PAROIS MOULÉES DONT LA CONCEPTION ET LE DIMENSIONNEMENT ONT ÉTÉ OPTIMISÉS.
机译:14号线向北延伸至Saint-Ouen的项目于2014年启动,目的是取消13号线的饱和并整合到未来的“大巴黎”网络中。该项目的公共合同由RATP和项目经理Systra授予。由Bouygues Travaux Publics,Soletanche Bachy France,Bessac和Soletanche Bachy Tunnels组成的联合体正在执行Clichy-Saint-Ouen站,Mairie-de-Saint-Ouen站的土建工程和三种深井式隧道的约2200 m隧道允许TBM进入和退出的结构。该合同价值约1.65亿欧元,工期为60个月。工位和竖井均包括经过优化设计和尺寸调整的隔板墙。%LE PROJET DE PRONONGEMENT NORD DE LA LIGNE 14JUSQU'ÀSAINT-OUEN POUR OBJECTIF LADÉSATURATIONDE LA LIGNE 13 ET L'INTÉGRATIONDANS LE FUTURRÉSEAUGRAND PARIS。 LE GROUPEMENT BOUYGUES TRAVAUX PUBLICS-索尔尼奇巴奇法国-贝萨克-索尔尼奇奇巴奇隧道RÉALISEENVIRON 2200 M DE TUNNEL DEPUIS LA STATION CLICHY-SAINT-OUEN,LEGÉNIECIVIL DE LA STESESES EN-ENESTE ENE ETENSE ET EN ETE ETE ET-ETE ET SORTIES DU TUNNELIER。 LA STATION ET LES PUTES代表了INTÉGRENTDES PAROISMOULÉESDON LA概念和LE LE尺寸ONÉTÉOPTIMISÉS。

著录项

  • 来源
    《Travaux》 |2016年第929期|28-35|共8页
  • 作者

    JERONI BOUDE;

  • 作者单位

    INGENIEUR TRAVAUX EN CHARGE DES TRAVAUX SPECIAUX DU LOTT02, SOLETANCHE BACHY FRANCE -MAXIME FONTY, INGÉNIEUR D'ÉTUDES, SOLETANCHE BACHY FRANCE - LAURENT DABET, DIRECTEUR TECHNIQUE DU PROJET LIGNE 14 LOTT02, BOUYGUES TRAVAUX PUBLICS;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 fre
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号