首页> 外文期刊>Travaux >BREST POLDER DEVELOPMENT PROJECT: EARTHWORKS AND STABILISATION
【24h】

BREST POLDER DEVELOPMENT PROJECT: EARTHWORKS AND STABILISATION

机译:布雷斯特圩田发展项目:土方工程与稳定

获取原文
获取原文并翻译 | 示例
           

摘要

In 2010, the Brittany Region, which has owned the commercial port of Brest since 2007, defined a strategy for the development of new sectors of industry In 2013, it awarded to an engineering consortium a project management contract for land improvements on Brest polder 124,24 ha in area, by 2021. This polder is located at the level of the former Saint-Marc cove which, after the establishment of a surrounding dyke in the 1950s, was filled with the dredging products and, after 2003, with very heterogeneous filler earth. The works required treatment of the polluted filler-earth materials, stabilisation of the hydraulic backfills and marine alluvia by vertical drains, and soil preloading while optimising earth movements.
机译:2010年,布列塔尼地区自2007年以来拥有布雷斯特的商业港口,确定了2013年开发新部门的发展战略,它授予工程联盟的工程联盟,这是一个项目管理合同,该项目管理合同对布雷斯特圩区124的土地改进,在44公顷的地区,到2021年。这个圩田位于前圣玛尔卡夫的水平,在20世纪50年代建立一个周围的堤坝之后,充满了疏浚产品,2003年以来,具有非常异质的填充剂地球。作品所需的处理污染的填充物质材料,通过垂直排水管稳定液压回填和海洋胃,以及土壤预加载,同时优化地球运动。

著录项

  • 来源
    《Travaux》 |2019年第950期|80-80|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号