...
首页> 外文期刊>Work Boat >Report faults Inside Passage oil spill response efforts
【24h】

Report faults Inside Passage oil spill response efforts

机译:报告内部漏油泄漏反应努力的故障

获取原文
获取原文并翻译 | 示例

摘要

The first 48 hours of response to the Nathan E Stewart tugboat ground- ing and oil spill was marked by delays, inadequate booms and spill response materials, and confusion over who was in charge, according to a report by Heiltsuk First Nation officials. The Oct. 13, 2016, accident left Kirby Offshore Marine's tugboat, the 3,400-hp, 95'3"×32'×13'7" Nathan E Stewart, and 52,000-bbl. tank barge DBL 55 hard aground on the Edge Reef at the entrance to the Seaforth Channel near Bella Bella, British Columbia.
机译:根据Heiltsuk First Nation官员的一份报告称,对Nathan E Stewart Tugboat拖船拖船的第一个48小时的回应标志着拖延和漏油机的延误和漏油机的延迟,不充分的繁荣和溢出材料,以及谁负责。 2016年10月13日,事故离开了柯比离岸海上拖船,3,400惠普,95'3“×32”×13'7“Nathan e Stewart和52,000-BBL。坦克驳船dbl 55在边缘礁石的搁浅在英国贝拉附近的海夫河的入口处,不列颠哥伦比亚省。

著录项

  • 来源
    《Work Boat 》 |2017年第6期| 22-23| 共2页
  • 作者

    Kirk Moore;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号