...
首页> 外文期刊>Windpower monthly >Siemens acts on Bonus collapse with more checks
【24h】

Siemens acts on Bonus collapse with more checks

机译:西门子通过更多检查来应对红利崩溃

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Questions remain over who pays for the additional inspections required following the failure of a Bonus turbine at the Danish Paludan Flaks offshore project in November. On 28 November 2015, one of ten Bonus Energy 2.3MW turbines at the 14-year-old Paludan Flaks offshore wind project near the Danish island of Samso suffered a catastrophic failure; the nacelle and blades broke off and fell into the sea. Catastrophic failure is defined as the complete, sudden, often-unexpected breakdown in a machine or other system. This winter, there have been four such events reported across the wind industry. With regular wind-turbine service and maintenance and the possibility of sophisticated condition monitoring, how is such an embarrassing failure - appearing as it seems out of the blue - still possible?
机译:在11月丹麦Paludan Flaks海上项目的Bonus涡轮机故障后,谁来为所需的额外检查支付费用仍存在疑问。 2015年11月28日,丹麦萨姆索岛附近具有14年历史的Paludan Flaks海上风电项目的10台Bonus Energy 2.3MW涡轮机之一发生了灾难性的故障;机舱和叶片断裂并掉入海中。灾难性故障定义为机器或其他系统中的完整,突然的,经常是意外的故障。今年冬天,风电行业发生了四起此类事件的报道。借助常规的风力涡轮机维修和保养以及对状态进行复杂监视的可能性,如何仍然可以解决这种令人尴尬的故障-似乎突然出现了?

著录项

  • 来源
    《Windpower monthly》 |2016年第3期|21-22|共2页
  • 作者

    Sara Knight;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号