...
首页> 外文期刊>Windpower monthly >Utility cash brings full-scale 15MW Nezzy2 within reach
【24h】

Utility cash brings full-scale 15MW Nezzy2 within reach

机译:公用事业现金在覆盖范围内为15MW Nezzy2提供全面

获取原文
获取原文并翻译 | 示例

摘要

A lfooded gravel pit near the port of Bremerhaven in northern Germany provided the test site for the launch of the 1:10-scale Nezzy2 prototype. At full size, it will be more than 350 metres wide and 200 metres tall, but even at this scale, peaking at around 18 metres above the water level, it has the appearance of a“real thing”;there are striking details in place, radically different from current industry practice. These include the self-aligning downwind layout with two closely interspaced counter-rotating rotors;the droplet-shaped towers in V-formation with guy-cables interlinking the towers to provide the tower-foundation interfaces;and only the three bright yellow buoyancy elements of the semi-sub platform protruding from the surface.
机译:在德国北部的布莱默汉港附近的一个Lfood的砾石坑,为1:10-SCALE Nezzy2原型推出了测试现场。全尺寸,它将超过350米宽,高200米,但即使在这种规模上,达到水位高出18米的达到峰值,它具有“真实的东西”;有一个醒目的细节,与当前行业实践无关。这些包括具有两个紧密间隔的反旋转转子的自对准下行布局;液滴形塔与Guy-Clables相互关联,以提供塔基地基界面;只有三个明亮的黄色浮力元素从表面突出的半子平台。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号