首页> 外文期刊>WET News >TEAM2100 inspects tidal defences
【24h】

TEAM2100 inspects tidal defences

机译:TEAM2100检查潮汐防御

获取原文
获取原文并翻译 | 示例
       

摘要

Detailed engineering and structural investigations into the condition of tidal flood defences in London and the Thames estuary are being carried out by TEAM2100, which includes engineering and programme management firm CH_2MHill, construction partner Balfour Beatty and other specialist contractors. The work is being carried out as part of the Environment Agency's (EA) ten-year programme to refurbish and replace tidal flood defences in London and the Thames estuary. The work will be largely complete by March 2016. The defences include. The EA said many of the defences, which include the Thames Barrier and 350km of flood walls and embankments, smaller barriers, pumping stations and flood gates, are more than 30 years old, and in some cases 100-plus years old. The investigations will provide information about the condition of individual defences as well as about the system as a whole. TEAM2100 is carrying out the first part of the EA's Thames Estuary 2100 Plan.
机译:TEAM2100正在对伦敦和泰晤士河口的防潮设施进行详细的工程和结构研究,其中包括工程和项目管理公司CH_2MHill,建筑合作伙伴Balfour Beatty和其他专业承包商。这项工作是环境署(EA)十年计划的一部分,该计划旨在翻新和替换伦敦和泰晤士河口的防潮堤。这项工作将在2016年3月基本完成。防御措施包括。 EA表示,许多防御系统已有30多年的历史,在某些情况下还具有100多年的历史,其中包括泰晤士河屏障和350公里的防洪墙和堤防,较小的屏障,泵站和防洪闸。调查将提供有关个人防卫状况以及整个系统的信息。 TEAM2100正在执行EA的Thames Estuary 2100计划的第一部分。

著录项

  • 来源
    《WET News》 |2015年第6期|3-3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:19:22

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号