首页> 外文期刊>Waterways world >HS2 CROSSINGS THREATEN CANALS
【24h】

HS2 CROSSINGS THREATEN CANALS

机译:HS2过境通道

获取原文
获取原文并翻译 | 示例
       

摘要

Plans unveiled recently for the proposed national HS2 high speed rail project from London to Birmingham showed the proposed route crossing over the canals in ten places. Two of these would leave headroom of less than five feet above the water, effectively severing the canal, while three more would be only ten feet high. At this stage it is not known if this would be the level of the track or the air draught available to boats. While British Waterways is not opposing construction, it is meeting transport officials to ensure any chosen route does not obstruct navigation or waterway restoration plans.
机译:最近从拟议中的从伦敦到伯明翰的国家HS2高铁项目公布的计划显示,拟议中的路线横跨十个运河。其中两个将离开水面不到五英尺的净空,有效地切断了运河,而另外三个则只有十英尺高。在此阶段,尚不清楚这将是船可用的航迹高度或空气吃水深度。尽管英国水道局不反对建造,但它正在与运输官员会面,以确保任何选定的路线都不会妨碍航行或水路修复计划。

著录项

  • 来源
    《Waterways world》 |2011年第5期|p.42|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:16:19

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号