首页> 外文期刊>Water >General news
【24h】

General news

机译:一般新闻

获取原文
获取原文并翻译 | 示例
       

摘要

200 kms of pipe, more than 70 underground road/rail crossings and three new advanced water treatment plants. It will be the largest recycled water scheme of its kind in the southern hemisphere, with the capacity to supply 232 megalitres of water per day to end-users. In addition to the construction of three new advanced water treatment plants, the WCRW Project includes the pipeline routes being delivered by the Eastern Pipeline Alliance and Western Pipeline Alliance. The pipeline will link existing water treatment plants and new advanced treatment plants to provide purified recycled water for end-users. The Western Pipeline will also transport purified recycled water from the advanced treatment plants to Tarong Power Station and Wivenhoe Dam.
机译:200公里的管道,70多个地下公路/铁路道口和三个新的先进水处理厂。这将是南半球同类最大的循环水方案,每天向最终用户提供232兆升水的能力。除了建设三个新的先进水处理厂外,WCRW项目还包括由东部管道联盟和西部管道联盟交付的管道路线。该管道将​​连接现有的水处理厂和新的高级处理厂,为最终用户提供纯净的循环水。西部管道还将把来自高级处理厂的纯净再生水输送到塔荣电站和威文霍大坝。

著录项

  • 来源
    《Water》 |2008年第3期|p.101-104|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号