首页> 外文期刊>Water >WATER HAMMER MODELLING FOR DESALINATED WATER DELIVERY
【24h】

WATER HAMMER MODELLING FOR DESALINATED WATER DELIVERY

机译:用于淡化水输送的水锤建模

获取原文
获取原文并翻译 | 示例
           

摘要

Sydney Water's Desalination Plant has been designed to produce an annual average 250 megalitres of water per day (ML7d), and can be expanded to produce an average of 500ML/d if required. The Water Delivery Alliance (WDA), designer and constructor of the water delivery infrastructure, produced detailed water hammer models of the WDA delivery infrastructure and varying network complexities of Sydney Water's existing Potts Hill system. The performance of various software packages over a range of network complexities was investigated, with implications and opportunities in water hammer design identified. Validation of water hammer modelling with field surge testing up to 310ML7d was also undertaken, and these results and subsequent design opportunities are discussed.
机译:悉尼水务的海水淡化厂的设计目的是每年平均每天生产250兆升水(ML7d),并且如果需要,可以扩大到平均每天生产500ML的水。输水基础设施的设计者和建造者,输水联盟(WDA)制作了WDA输水基础设施的详细水锤模型,以及Sydney Water现有的Potts Hill系统的各种网络复杂性。调查了各种软件包在各种网络复杂性下的性能,并确定了水锤设计的意义和机会。还进行了高达310ML7d的现场浪涌测试对水锤模型的验证,并讨论了这些结果和后续设计机会。

著录项

  • 来源
    《Water》 |2011年第5期|p.74-78|共5页
  • 作者

    R Wilson; K Zic; B Leonard;

  • 作者单位

    Principal Water Resources Engineer and Project Manager in KBR's Sydney office;

    KBR's Chief Technical Advisor for Water Resources and is based in the Perth office;

    Mechanical Engineer based in KBR's Perth office;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号