首页> 外文期刊>Water Science and Technology >Experience with the design and start up of two full-scale UASB plants in Brazil: enhancements and drawbacks
【24h】

Experience with the design and start up of two full-scale UASB plants in Brazil: enhancements and drawbacks

机译:在巴西设计和启动两家全面的UASB工厂的经验:改进和缺点

获取原文
获取原文并翻译 | 示例
           

摘要

This paper discusses the main drawbacks and enhancements experienced with the design andnstart up of two full-scale UASB plants in Brazil. The topics addressed are related to blockage ofninlet pipes, scum accumulation, seed sludge for the start-up, corrosion and gas leakage, odourngeneration and sludge management. The paper describes the main improvements achieved.
机译:本文讨论了巴西两家UASB大型工厂的设计和启动所遇到的主要弊端和改进。涉及的主题涉及小管堵塞,浮渣积聚,启动时的污泥,腐蚀和气体泄漏,产臭和污泥管理。本文介绍了主要的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号