首页> 外文学位 >Evaluation of performance for a novel side stream enhanced biological phosphorus removal configuration at a full-scale wastewater treatment plant.
【24h】

Evaluation of performance for a novel side stream enhanced biological phosphorus removal configuration at a full-scale wastewater treatment plant.

机译:在新型废水处理厂对新型侧流增强生物除磷配置的性能进行评估。

获取原文
获取原文并翻译 | 示例

摘要

Many wastewater treatment plants (WWTP) in the United States are facing new and previously unregulated phosphorus discharge limits from government regulatory agencies. While conventional enhanced biological phosphorus removal (EBPR) design criteria is proven and easily incorporated into the construction of new WWTPs, pre-existing WWTP often have site and capital constraints that make conventional EBPR designs costly and difficult to implement. A full-scale novel side stream EBPR configuration was implemented and tested at Metro Wastewater Reclamation District's Robert W. Hite Treatment Facility in Denver, Colorado. By design, the side stream EBPR configuration shows advantage over mainstream EBPR configurations because the integrity of the anaerobic zone is protected from downstream electron acceptors and high suspended solids concentrations in the side stream reactor allows for a minimal footprint. The results from an eight month 106 MGD demonstration showed excellent EBPR process performance. The attributes that make this EBPR configuration unique are the carbon requirement for anaerobic volatile fatty acid uptake is satisfied with gravity thickener overflow and the configuration required minimal construction and modifications to existing infrastructure for implementation. During the proof-of-concept test phase the novel EBPR configuration produced an average effluent total phosphorus concentration equal to 0.58 mg-P/L and a phosphate concentration of 0.11 mg-P/L. Evaluation of the novel EBPR configuration involved a detailed characterization of the gravity thickener overflow and extensive phosphate profiling throughout the secondary treatment complex. The design of the side stream EBPR configuration, process considerations, results of the study and future design considerations are discussed.
机译:美国许多废水处理厂(WWTP)面临着来自政府监管机构的新的和以前不受管制的磷排放限值。尽管传统的增强型生物除磷(EBPR)设计标准已被证明并易于纳入新的污水处理厂的建设中,但现有的污水处理厂通常具有场地和资金限制,这使得常规的EBPR设计既昂贵又难以实施。在科罗拉多州丹佛市的地铁废水回收区的Robert W. Hite处理设施中实施并测试了全尺寸新型侧流EBPR配置。通过设计,侧流EBPR配置显示出优于主流EBPR配置的优势,因为可保护厌氧区的完整性不受下游电子受体的影响,并且侧流反应器中的高悬浮固体浓度可将占地面积降至最低。一个为期八个月的106 MGD演示的结果显示出出色的EBPR工艺性能。使这种EBPR配置独特的属性是通过重力增稠器溢流满足厌氧性挥发性脂肪酸摄取的碳需求,并且该配置所需的结构最少,并且无需改动即可实施。在概念验证测试阶段,新的EBPR配置产生的平均废水总磷浓度等于0.58 mg-P / L,磷酸盐浓度为0.11 mg-P / L。对新型EBPR构型的评估涉及重力增稠剂溢流的详细表征,以及整个二级处理系统中广泛的磷酸盐分布。讨论了旁流EBPR配置的设计,过程注意事项,研究结果和将来的设计注意事项。

著录项

  • 作者

    Carson, Kurt.;

  • 作者单位

    University of Colorado at Boulder.;

  • 授予单位 University of Colorado at Boulder.;
  • 学科 Engineering Environmental.;Chemistry Biochemistry.;Biology Botany.
  • 学位 M.S.
  • 年度 2012
  • 页码 98 p.
  • 总页数 98
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号