...
首页> 外文期刊>Water Resources Management >Planning for a Large Dam Project: The Case of Traveston Crossing Dam
【24h】

Planning for a Large Dam Project: The Case of Traveston Crossing Dam

机译:大型水坝项目的规划:特拉维斯顿穿越水坝的案例

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The approval for a large dam project proposal these days predominantly involves satisfying broadly the criteria of economic development, social equity, and environmental sustainability. It is justified that the criterion of economic development seeks full project cost recovery as well as significant contribution to economic growth of a region. Cost-benefit analysis is normally used as the yardstick for economic development but it has limitations and a better method is warranted. Social equity considerations should embody the need to address the concerns of all sections in communities to be impacted by a project and involve them in the decision-making process. The lapse of this aspect in project planning of the past has led, at least as being partly responsible, to disastrous consequences. Environmental sustainability should seek to ensure that the vital components of the environment are preserved such that the future generation can use the natural resources to their benefit at least as much as the current generation. Environmental sustainability is arguably the most contentious criteria among these. The vagueness in the concept of environmental sustainability and the tendency of the society to err on the safe side have caused many large dam project proposals not reach their fruition. An attempt is made in this paper to define environmental sustainability in a more meaningful way from an analytic viewpoint. The case of Traveston Crossing Dam project in southeast Queensland, Australia is presented as an illustrative example and to evaluate the performance and relevance of the three broad criteria in a real-world application. The case study is also an example of the fact that environmental awareness can lead to enormous level of socio-political forces which can create many hurdles to cross by a democratic government.
机译:如今,大型水坝项目提案的批准主要涉及广泛满足经济发展,社会公平和环境可持续性的标准。有理由认为,经济发展的标准是寻求全部项目成本的回收以及对地区经济增长的重大贡献。成本效益分析通常用作经济发展的准绳,但它有局限性,有必要采用更好的方法。社会公平的考虑应体现出解决社区中所有受项目影响的部分并使其参与决策过程的需要。过去在项目规划中这方面的失误导致(至少部分负责)灾难性的后果。环境的可持续性应设法确保保护环境的重要组成部分,以使子孙后代可以利用自然资源,至少与当前一代一样受益。环境可持续性可以说是其中最有争议的标准。环境可持续性概念的模糊性和社会倾向于安全方面的趋势已导致许多大型水坝项目建议未能实现。本文试图从分析的角度以更有意义的方式定义环境的可持续性。以澳大利亚昆士兰州东南部的Traveston Crossing大坝项目为例,以评估实际应用中这三个主要标准的性能和相关性为例。案例研究也是一个事实的例子,即环境意识会导致巨大水平的社会政治力量,这会为民主政府带来许多障碍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号