...
首页> 外文期刊>International Water Power & Dam Construction >Why did the road close for Traveston Crossing Dam?
【24h】

Why did the road close for Traveston Crossing Dam?

机译:为什么特拉维斯顿过境大坝道路封闭?

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The severe drought at the beginning of the twenty-first century across southeast Queensland (SEQ), Australia has not been witnessed for more than a century. It prompted Brisbane, a metropolis of 2M people, in its desperate quest for additional water supply. After meticulous investigation of all possible options at the state government's initiative, the Department of Natural Resources and Water came to the conclusion in 2006 that a dam on the Mary River near Traveston would be the best option with a desalination plant being a distant second. The dominating factors in the selection of the Traveston Crossing dam (TCD), as it became known, were: (1) It would provide the highest yield of any surface water option available in SEQ. (2) Development can be staged to increase yield in future. (3) The geographic location is appropriate to service Brisbane and the Sunshine Coast. (4) The river has the highest discharge in the region with lowest storage and use. (5) The catchment has the highest and most reliable rainfall in SEQ (6) It would provide flood mitigation downstream including the town of Gympie.
机译:在二十一世纪初,昆士兰州东南部(SEQ)横贯澳大利亚的严重干旱已经有一个多世纪了。它促使布里斯班这个拥有200万人口的大都市拼命寻求额外的供水。在州政府的倡议下,对所有可能的选择方案进行了认真的调查之后,自然资源和水务部在2006年得出结论,在特拉维斯顿附近的玛丽河上的水坝将是最好的选择,而海水淡化厂仅次于第二。众所周知,选择Traveston Crossing大坝(TCD)的主要因素是:(1)在SEQ中可用的任何地表水选项中,产量最高。 (2)可以分阶段开发以增加将来的产量。 (3)地理位置适合服务布里斯班和阳光海岸。 (4)河流的蓄水量和使用量最少的地区是最高的。 (5)流域的降雨是SEQ(6)中最高和最可靠的。它将为下游(包括金皮镇)提供防洪减灾服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号