...
首页> 外文期刊>Water Resources Management >The Influence of Objective Function and Acceptability Threshold on Uncertainty Assessment of an Urban Drainage Hydraulic Model with Generalized Likelihood Uncertainty Estimation Methodology
【24h】

The Influence of Objective Function and Acceptability Threshold on Uncertainty Assessment of an Urban Drainage Hydraulic Model with Generalized Likelihood Uncertainty Estimation Methodology

机译:目标函数和可接受性阈值对采用广义似然不确定性估计方法的城市排水水力模型不确定性评估的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Urban drainage model is an important computer-aided tool in stormwater management and drainage planning and designing. A popular urban drainage hydraulic model, stormwater management model (SWMM), was applied in a pump lifting combined sewer system for a high-intensity urban catchment located in Shanghai, China. Uncertainty of SWMM water quantity parameters was assessed with generalized likelihood uncertainty estimation (GLUE) methodology. The sensitivity of parameters was discussed and compared based on the results of uncertainty analysis. To discuss the influence of the acceptability threshold on model parameter sensitivity and the margin of uncertainty band, the GLUE approach was applied several times varying acceptability threshold. The results indicated that a higher acceptability threshold value is contributed to achieve a stricter verification with a high confidence level, and the uncertainty analysis significant level can be featured by the value of acceptability threshold. The selection of acceptability threshold value can be regarded as a tradeoff process. Both reducing the low efficient simulation and reducing computation cost should be considered for the selection of acceptability threshold. Moreover, the GLUE approach was applied several times varying different objective functions with corresponding acceptability thresholds. The results indicated that some parameters may be sensitive to a specific objective function, and other parameters may be sensitive to another objective function. Some parameters cannot easily identified when a single objective function was used within the GLUE approach, and a multiple-objective function combined different objective functions requirements, may be a alternative approach to reduce the model prediction uncertainty.
机译:城市排水模型是雨水管理和排水规划设计中重要的计算机辅助工具。一种流行的城市排水水力模型(雨水管理模型(SWMM))被应用在位于中国上海的高强度城市集水区的泵提升组合下水道系统中。 SWMM水量参数的不确定性用广义似然不确定性估计(GLUE)方法进行了评估。基于不确定度分析的结果,对参数的敏感性进行了讨论和比较。为了讨论可接受性阈值对模型参数灵敏度和不确定带裕度的影响,采用GLUE方法几次改变可接受性阈值。结果表明,较高的可接受性阈值有助于实现更严格的验证,并具有较高的置信度,而不确定性分析的显着水平可以由可接受性阈值来表征。可接受性阈值的选择可以被视为权衡过程。选择可接受性阈值时,应同时考虑降低低效率仿真和降低计算成本。此外,GLUE方法被应用了几次,以不同的目标函数和相应的可接受性阈值来改变。结果表明,某些参数可能对特定目标函数敏感,而其他参数可能对另一目标函数敏感。当在GLUE方法中使用单个目标函数时,某些参数不容易识别,而结合了不同目标函数要求的多目标函数可能是减少模型预测不确定性的替代方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号