首页> 外文期刊>Water Research >A Bayesian method to estimate proportional payments of users in a wastewater treatment plant
【24h】

A Bayesian method to estimate proportional payments of users in a wastewater treatment plant

机译:贝叶斯方法估算废水处理厂用户的比例付款

获取原文
获取原文并翻译 | 示例
       

摘要

A simple Bayesian method to estimate proportional payments for using or constructing a wastewater treatment plant is presented. The method addresses the usually unknown individual participation in global pollution, of municipal and industrial wastewaters that are normally discharged into the same collecting pond. The individual contributions are calculated from the discharged volume of each source and its pollution percentage in the wastewater volume previous to the disposal. According to the method presented here, the costs in building and/or running the plant can be covered by proportional individual payments based on the individual contributions, in a more even way. The simplicity of the model allows to assess different strategies for the participants in a wastewater treatment system. A real case study in the Izta-Popo National Park, located in the Mexican States of Puebla, Mexico and Morelos, is analyzed.
机译:提出了一种简单的贝叶斯方法来估算使用或建造废水处理厂的比例付款。该方法解决了通常排放到同一收集池中的市政和工业废水中普遍未知的个人参与全球污染的问题。根据每个排放源的排放量及其在处理前的废水量中的污染百分比来计算单个贡献。根据此处介绍的方法,建造和/或运营工厂的成本可以通过基于个人缴款的成比例的个人付款以更均匀的方式支付。该模型的简单性允许评估废水处理系统参与者的不同策略。分析了位于墨西哥普埃布拉州,墨西哥州和莫雷洛斯州伊兹塔-波波国家公园的真实案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号