首页> 外文期刊>Water environment & technology >Why many control systems fail
【24h】

Why many control systems fail

机译:为什么许多控制系统出现故障

获取原文
获取原文并翻译 | 示例
       

摘要

When implementing real-time process control systems at wastewater treatment plants (WWTPs), several technical problems may have to be addressed. Sensors have to be reliable. Controllers should be properly designed and tuned. Fault detection should be implemented and safety nets designed. Actuators must have adequate control authority to deal with changing influent quality and quantity. But in their 1998 Water Science Technology (Vol. 37, No. 12, pp. 397-401) article "Reviewing, assessing, and speculating," G. Olsson and B. Newell argue that it is the "human factor" that is often neglected even though it creates more problems than the technology.
机译:在废水处理厂(WWTP)实施实时过程控制系统时,可能需要解决几个技术问题。传感器必须可靠。控制器应经过适当设计和调整。应实施故障检测并设计安全网。执行器必须具有足够的控制权,以应对变化的进水质量和数量。但是,G。Olsson和B. Newell在其1998年的《水科学技术》(第37卷,第12期,第397-401页)文章“审查,评估和推测”中指出,这是“人为因素”经常被忽视,即使它比技术带来更多的问题。

著录项

  • 来源
    《Water environment & technology》 |2012年第6期|p.43-45|共3页
  • 作者

    Leiv Rieger; Gustaf Olsson;

  • 作者单位

    EnviroSim Associates Ltd. (Hamilton, Ontario);

    Lund (Sweden) University;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:43:56

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号