首页> 外文期刊>Waste and water management in Australia >New 3D environment doubles productivity for trench and sloping ditch design
【24h】

New 3D environment doubles productivity for trench and sloping ditch design

机译:新的3D环境使沟槽和倾斜沟槽设计的生产率提高了一倍

获取原文
获取原文并翻译 | 示例
           

摘要

Intergraph~® Process, Power & Marine (PP&M) has released a new Task Based Modelling Environment for Civil Design as part of Intergraph Smart™ 3D. The Civil Task includes next-generation 3D design capabilities for electrical and piping trenches, as well as sloping ditches. This new Task was developed in joint collaboration with leading global engineering companies. The main partner was Technip, with its France office developing specifications, and with Technip Malaysia who has been using the new environment in a project since June 2015. The Civil Task answers the market demand for a civil engineering application enabling routing and dynamic modification of ditches and trenches through a complex sequence of changing: elevations, transitions, materials and branching needs. The environment includes a set of placement methods to accommodate electrical cables, layers of piping and various fluid types. In addition, the Civil Task provides downstream integration to other SmartPlant~® solutions, ensuring information integrity and reuse for all disciplines.
机译:作为Intergraph Smart™3D的一部分,Intergraph〜®过程,电力与船舶(PP&M)发布了一种新的基于任务的民用设计建模环境。 Civil Task包括用于电气和管道沟渠以及倾斜沟渠的下一代3D设计功能。这项新任务是与全球领先的工程公司共同合作开发的。主要合作伙伴是Technip,其法国办事处负责制定规范,而Technip Malaysia则从2015年6月开始在一个项目中使用新环境。Civil Task满足了对土木工程应用的市场需求,从而能够对沟渠进行路由和动态修改以及一系列复杂的变化过程:高程,过渡,材料和分支需求。环境包括一组放置方法,以容纳电缆,管道层和各种流体类型。此外,Civil Task还提供了与其他SmartPlant〜®解决方案的下游集成,从而确保信息的完整性和对所有学科的重用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号