首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >CNOOC eyes jack-up for offshore wind farms
【24h】

CNOOC eyes jack-up for offshore wind farms

机译:Cnooc眼睛搬出了离岸风电场

获取原文
获取原文并翻译 | 示例
           

摘要

CHINA National Offshore Oil Corporation (CNOOC) will soon launch a bid seeking a contractor to provide engineering, procurement and construction services to build the company's first jack-up wind farm installation vessel. The decision to build its own vessel is in line with the company's strategy to capitalise on its expertise in building and installing offshore oil and gas facilities to diversify with the energy transition, including adding offshore wind farms to its asset base. CNOOC, via its vessel manager CNOOC Energy Technology & Services (CenerTech), has already selected a preferred bidder for the installation vessel's front-end engineering and design work.
机译:中国国家海上石油公司(中海油)将很快推出寻求承包商的投标,以提供工程,采购和建筑服务,以建立公司的第一家杰出风电场安装船。 建立自己的船只的决定符合公司的战略,以利用其在建设和安装海上石油和天然气设施方面的专业知识,以便在能源转换中多元化,包括将离岸风电场添加到其资产基础上。 CNOOC通过其船经理CNOOC能源技术与服务(CENERTECH),已经为安装船的前端工程和设计工作选择了首选投标人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号