首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Well result promising for Yakaar-Teranga project
【24h】

Well result promising for Yakaar-Teranga project

机译:Yakaar-Teranga项目的良好结果令人鼓舞

获取原文
获取原文并翻译 | 示例
           

摘要

BP'S plans to establish a second liquefied natural gas project off north-west Africa took a major step forward after a successful appraisal well was drilled this week on its Yakaar discovery off Senegal. The Yakaar-2 well was drilled by the drillship Valaris DS-12 which is now en route to Mauritania to drill another key probe for BP, the results of which will be critical to underpin a potential third LNG project in the region. Greater Tortue Ahmeyim is the first LNG scheme, with phase one due on line in 2022 via subsea wells and a floating production, storage and offloading vessel feeding gas to a floating LNG unit installed behind a breakwater.
机译:在本周在塞内加尔附近的Yakaar发现井上成功钻探一口评估井之后,BP在西北非洲以外建立第二个液化天然气项目的计划向前迈出了重要的一步。 Yakaar-2井是由Valaris DS-12钻探船钻探的,该钻探船目前正在前往毛里塔尼亚,以钻探BP的另一个关键探管,其结果对于巩固该地区潜在的第三个LNG项目至关重要。 Greater Tortue Ahmeyim是第一个液化天然气计划,第一阶段计划于2022年通过海底井上线,并通过一个浮式生产,储存和卸载船将天然气输送到安装在防波堤后的浮式LNG装置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号