首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >BP now ready to play the ACE card off Azerbaijan
【24h】

BP now ready to play the ACE card off Azerbaijan

机译:BP现在准备在阿塞拜疆附近打出ACE卡

获取原文
获取原文并翻译 | 示例
       

摘要

THE BP-led consortium developing the Azeri-Chirag-Guneshli (ACG) oilfield complex in Azerbaijan's Caspian Sea waters has given the green light to its $6 billion Azeri Central East (ACE) expansion project. The scheme centres on the installation of a major new platform in the giant field complex that originally came on stream in 1997. The ACE platform will be installed in the Azeri field between the existing Central Azeri and East Azeri platforms. This giant production, drilling and quarters platform is targeted to come online in 2023 with a capacity of up to 100,000 barrels per day of oil and is intended to produce up to 300 million barrels of oil over its lifetime.
机译:由BP牵头的财团在阿塞拜疆里海水域开发Azeri-Chirag-Guneshli(ACG)油田综合体,为其60亿美元的Azeri Central East(ACE)扩建项目开了绿灯。该计划的重点是在巨型现场综合设施中安装一个主要的新平台,该平台最初于1997年投入运营。ACE平台将安装在现有的Central Azeri和East Azeri平台之间的Azeri现场。这个庞大的生产,钻探和钻探平台平台计划于2023年上线,日产量可达100,000桶石油,并计划在其使用寿命内生产多达3亿桶石油。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号