...
首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >McDermott comes top of the pile for Sepia work
【24h】

McDermott comes top of the pile for Sepia work

机译:McDermott成为棕褐色工作的重中之重

获取原文
获取原文并翻译 | 示例
           

摘要

US OILFIELD services giant McDermott International has submitted the lowest bid in a closely-watched Petrobras tender to contract a rigid riser-based system for the Sepia field in Brazil's Santos basin pre-salt province. Sources told Upstream that McDermott presented a commercial offer of about 1.09 billion reais ($294.5 million) to carry out engineering, procurement, construction and installation of a seven-well set riser to be linked to the Carioca floating production, storage and offloading vessel.
机译:美国石油服务公司巨头麦克德莫特国际公司(McDermott International)在巴西石油公司(Petrobras)招标中提交了最低报价,该合同是为巴西桑托斯盆地盐下省的棕褐色油田签定一套基于立管的刚性系统。消息人士告诉上游,McDermott提出了约10.9亿雷亚尔(2.945亿美元)的商业报价,以进行工程,采购,建造和安装七口井立管的工作,该立管将与Carioca浮式生产,储存和卸货船连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号