首页> 外国专利> PILE TOP TREATING METHOD OF CAST-IN-PLACE PILE USING NONDESTRUCTIVE MEASUREMENT AND PILE TOP TREATING DEVICE OF CAST-IN-PLACE PILE USED IN THE TREATING METHOD

PILE TOP TREATING METHOD OF CAST-IN-PLACE PILE USING NONDESTRUCTIVE MEASUREMENT AND PILE TOP TREATING DEVICE OF CAST-IN-PLACE PILE USED IN THE TREATING METHOD

机译:基于无损测量的现浇桩桩顶处理方法及该方法中的现浇桩桩顶处理装置

摘要

PURPOSE: To enhance workability by measuring and storing the position of the reinforcement of a reinforced concrete head part by means of nondestructive examination, and also by controlling an extra-high pressure water injection device through personal computer communication, so that the extra-banking concrete can be crushed. ;CONSTITUTION: The head part of a reinforced concrete 9 such as a continuous underground wall or a cylindrical foundation pile is chipped away little by little, and the positions of reinforcing bars 11 are measured by using a nondestructive measuring device 2 by means of ultrasonic wave, radiation, magnetism, electromagnetic induction, or the like. Then, the measured value is stored in a buffer memory 3, and also is connected to a personal computer 1 for transmitting it to a monitor 4 through a communication circuit 12. Then, while being subjected to picture image processing, the positions of the concrete and the reinforcing bars 11 are confirmed. Further, an extra-high pressure water injection device 6 is controlled by a control unit 5, and the extra-banking concrete is crushed by the extra-high pressure water. Furthermore, a water repellent is coated on the part where the reinforcing bars 11 are connected to the upper structure, so that the separation of concrete can be facilitated. Thus, the positions of the reinforcing bars can be detected without requiring skill, and the work efficiency can be enhanced.;COPYRIGHT: (C)1996,JPO
机译:目的:通过无损检测来测量和存储钢筋混凝土头部的钢筋位置,并通过个人计算机通信控制超高压注水装置,以提高可施工性,从而增加混凝土的使用寿命。可以被压碎。 ;组成:钢筋混凝土9的头部,例如连续的地下墙或圆柱形基础桩,一点一点地被切掉,并且钢筋11的位置是使用无损测量装置2通过超声波测量的,辐射,磁性,电磁感应等。然后,将测量值存储在缓冲存储器3中,并且还连接至个人计算机1,以通过通信电路12将其发送至监视器4。然后,在进行图片图像处理的同时,混凝土的位置确认钢筋11。另外,超高压注水装置6由控制单元5控制,超堤坝混凝土被超高压水压碎。此外,在将钢筋11连接到上部结构的部分上涂覆防水剂,从而可以促进混凝土的分离。因此,不需要技巧就可以检测出钢筋的位置,并可以提高工作效率。;版权所有:(C)1996,日本特许厅

著录项

  • 公开/公告号JPH08105042A

    专利类型

  • 公开/公告日1996-04-23

    原文格式PDF

  • 申请/专利权人 B S R:KK;HORI KENICHI;

    申请/专利号JP19940276920

  • 发明设计人 SANADA TSUNAO;HORI KENICHI;

    申请日1994-10-05

  • 分类号E02D5/34;

  • 国家 JP

  • 入库时间 2022-08-22 03:58:46