首页> 外文期刊>Upstream: The International Oil & Gas Newspaper >Heavyweights in ring for Shwe 3 FEED contest
【24h】

Heavyweights in ring for Shwe 3 FEED contest

机译:重量级选手参加Shwe 3 FEED竞赛

获取原文
获取原文并翻译 | 示例
       

摘要

TOP-TIER oilfield services companies are preparing to submit offers for front-end engineering and design linked to the large third-phase development of the Shwe gas project off Myanmar. Phase three of the Posco Daewoo-operated project will focus on the fabrication and installation of a large low-pressure compression platform. The new facility will be anchored by a steel jacket weighing up to 13,000 tonnes plus piles and supporting a topsides of more than 10,000 tonnes. The compression platform will be bridge-linked 111 metres to the existing Shwe offshore drilling, production and processing platform.
机译:TOP-TIER油田服务公司正准备提交与缅甸海上Shwe天然气项目的大型三期开发相关的前端工程和设计报价。由浦项大宇(Posco Daewoo)经营的项目的第三阶段将集中于大型低压压缩平台的制造和安装。新工厂将由重达13,000吨加桩的钢护套固定,并支撑超过10,000吨的顶部。压缩平台将与现有的Shwe海上钻探,生产和加工平台连接111米。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号