【24h】

Driving the Elbe Tunnel

机译:驾驶易北河隧道

获取原文
获取原文并翻译 | 示例
       

摘要

The meeting of the BTS on January 20 took place in London at the Institution of Civil Engineers and was devoted to a paper by Martin Herrenknecht of Herrenknecht International on the Fourth Elbe Road Tunnel in Hamburg. Martin Herrenknecht explained that his company had been responsible for supplying the 14.2m Mixshield used to drive the 2.7km tunnel. The machine, named 'Trude', is the largest diameter shield machine ever manufactured and has been equipped with some major technical innovations to carry out such a demanding project.
机译:BTS的会议于1月20日在伦敦的土木工程师学会举行,专门讨论了海瑞克国际公司的马丁·海瑞克特在汉堡第四条易北河公路隧道上发表的论文。马丁·海瑞克(Martin Herrenknecht)解释说,他的公司负责提供用于驱动2.7公里隧道的14.2m混合盾。该机器名为“ Trude”,是有史以来生产的最大直径的盾构机,并且配备了一些重大的技术创新来执行这一要求苛刻的项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号