Drill and blast has been used for both underground and surface excavations. Underground, extensive lining and support works were required whilst above ground construction of houses and a bridge was underway. All this has been carried out at the same time and, in addition, the existing underground wastewater plant had to remain in operation. Final designs, especially those related to access, had to be extremely accurate, as alterations during construction could impact upon the construction schedule. However, despite these huge logistical pressures, construction progressed successfully and excavation of the new extension was completed on schedule, in January 2002. No major problems have arisen from the coexistence of the treatment plant works and neighbouring housing works, and no major damage was caused to the existing structures by blast vibrations. Detailed preplanning and tight cooperation during the excavation phase between the owner, designer and contractor ensured the advance through the critical weakness zone progressed smoothly.
机译:钻爆已用于地下和地面挖掘。在地下建造房屋和桥梁时,需要进行地下,大量的衬砌和支撑工程。所有这些都同时进行,此外,现有的地下废水处理厂必须继续运行。最终设计,尤其是与通道相关的最终设计,必须非常准确,因为施工期间的更改可能会影响施工进度。但是,尽管存在巨大的后勤压力,但建设进展顺利,新扩建工程的开挖工作已于2002年1月按计划进行。污水处理厂工程与邻近房屋工程并存未引起重大问题,也未造成重大破坏爆炸振动作用到现有结构上。在开挖阶段,业主,设计师和承包商之间进行了详细的预先计划并进行了紧密合作,确保了通过关键薄弱环节的推进顺利进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号