...
【24h】

Communication is key

机译:沟通是关键

获取原文
获取原文并翻译 | 示例
           

摘要

To most, the expression "risk assessment" is associated with the likes of TBM selection or ground conditions, etc. It is therefore interesting to see that a recent audit into last year's collapse of a short section of the Hanekleiv Tunnel, in Norway, has attached a significant degree of the blame on managerial aspects of the project's set-up during its construction in the mid-90s (p8).rnAt the time, the client, the Norwegian Public Roads Administration (NPRA), whom it must be said has an exemplary record, had just undergone a re-structuring that separated its construction department into two units and had them working together on the Hanekleiv Tunnel.
机译:在大多数情况下,“风险评估”一词与诸如TBM选择或地面条件等相关。因此,有趣的是,最近对挪威Hanekleiv隧道一小段的倒塌进行了一次审计,在90年代中期(p8)的施工过程中,将项目设置的管理方面归咎于很大程度上。(n)当时,客户,挪威公共道路管理局(NPRA),必须说这是一个出色的记录,刚刚进行了重组,将其建筑部门分为两个部门,并让他们在Hanekleiv隧道上共同工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号