首页> 外文期刊>Tunnels & tunnelling international >Apportionment of tunnelling risk
【24h】

Apportionment of tunnelling risk

机译:隧道风险分摊

获取原文
获取原文并翻译 | 示例
           

摘要

Following on from the BTS meeting report on the Dublin Port Tunnel (p30), construction solicitor Rob Buchanan of Pinsent Masons, flags up the importance of early risk management strategies I was lucky to be at the BTS seminar "Design and Construction of the Dublin Port Tunnel" on 19 October. Great job, completed in difficult circumstances in a city which hadn't really had anything to do with tunnelling of that scale and complexity and wasn't used to dealing with the inevitable, if minor, disruptions.
机译:在BTS关于都柏林港口隧道(p30)的会议报告之后,Pinsent Masons的建筑律师Rob Buchanan提出了早期风险管理策略的重要性,我很幸运能够参加BTS研讨会“都柏林港口的设计与建设”隧道”。出色的工作,是在一个艰难的环境中完成的,而这个城市实际上与这种规模和复杂性的挖掘工作没有任何关系,并且不习惯于应对不可避免的(即使是很小的)破坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号