首页> 外文期刊>Tunnels & tunnelling international >Breakthroughs at Krolsky, Seville
【24h】

Breakthroughs at Krolsky, Seville

机译:塞维利亚Krolsky的突破

获取原文
获取原文并翻译 | 示例
       

摘要

Lovat has been busy with its TBMs achieving breakthrough on the Krolsky rail tunnel in Russia, and the Seville metro, whilst securing another order in China for the Chengdu metro. The 9.5m diameter mixed face TBM completed the 2,250m long rail bore at Krolsky, in east Siberia, which had varied and difficult geology with fissures, fractures and high inflow rates. Geology along the route comprises slate and granite of up to UCS 250MPa, and blocky sections, as well as saturated loose strata. Inflow varied up to 300m~3 per hour.
机译:洛瓦(Lovat)一直在忙于其TBM在俄罗斯的Krolsky铁路隧道和塞维利亚地铁上取得突破,同时又在中国获得了成都地铁的另一笔订单。直径9.5m的混合面TBM在西伯利亚东部的Krolsky完成了2,250m长的铁路钻孔,地质条件多样且困难,有裂缝,裂缝和高流入率。沿途的地质包括高达UCS 250MPa的板岩和花岗岩,块状剖面以及饱和的松散地层。每小时流入量最大为300m〜3。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号