首页> 外文期刊>Tunnels & tunnelling international >Ground movement disturbs Belfast street
【24h】

Ground movement disturbs Belfast street

机译:地面运动扰乱了贝尔法斯特街

获取原文
获取原文并翻译 | 示例
       

摘要

Engineers in Belfast are working to repair the ground on Cromac Street after tunnelling disturbed a void beneath the surface causing the ground to sag. Northern Ireland Water has confirmed that the depression is located above a new storm water tunnel, which is part of the Belfast Sewers Project.rnRemedial work is now underway and as T&TI went to press a reinforced concrete road base slab had been poured which needed several days to achieve the required strength. After this new black top surfacing will be laid.
机译:贝尔法斯特的工程师在隧道扰乱了地面下方的空隙导致地面下陷之后,正在维修Cromac街的地面。北爱尔兰水务局已确认该凹陷位于贝尔法斯特污水处理厂项目的新雨水隧道上方。rn正在进行补救工作,随着T&TI压榨钢筋混凝土路基板,这需要几天的时间达到所需的强度。之后,将铺设新的黑色顶部饰面。

著录项

  • 来源
    《Tunnels & tunnelling international》 |2009年第11期|7|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 01:36:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号