首页> 外文期刊>Tunnels & tunnelling international >CROSSOVER TBMS TACKLE MUMBAI CHALLENGES
【24h】

CROSSOVER TBMS TACKLE MUMBAI CHALLENGES

机译:Crossover TBMS解决孟买挑战

获取原文
获取原文并翻译 | 示例
       

摘要

Right from the very early stages in the design phase of metro projects around the world, design consultants have included a specification clause stipulating that the tunnel boring machines must be capable of boring in closed mode and be able to maintain face pressure. This of course is to mitigate the risk of ground settlement associated with open-face machines when they encounter unstable geology. However, the clause is also related to preventing depletion of the water table on many projects. After studying this clause in the tender documents, contractors invariably start to assess the advantages and disadvantages of slurry machines versus EPB machines. The problem is that neither slurry nor EPB machines perform particularly well when boring in rock.
机译:从世界各地地铁项目的设计阶段的早期阶段,设计顾问已经包括规范条款,规定隧道镗床必须能够在闭合模式下镗孔,并能够保持面部压力。这当然是在遇到不稳定地质时减轻与开孔机相关的地面沉降的风险。但是,该条款也与防止在许多项目上耗尽水表有关。在招标文件中研究这个条款后,承包商总是开始评估泥浆机与EPB机器的优缺点。问题是,在岩石中镗孔时,既不浆料也不表现出特别好。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号