...
首页> 外文期刊>Tunnelling and underground space technology >The qualitative risk assessment of MINI, MIDI and MAXI horizontal directional drilling projects
【24h】

The qualitative risk assessment of MINI, MIDI and MAXI horizontal directional drilling projects

机译:MINI,MIDI和MAXI水平定向钻井项目的定性风险评估

获取原文
获取原文并翻译 | 示例

摘要

The differences between uncertainty, risk and hazard in horizontal directional drilling (HDD) technology were described in this paper. Various types of uncertainty in HDD technology were shown on the chosen examples. Due to the increasing complexity of HDD projects, the continuous development in HDD technology, the optional possibility of applying various tools and machines and the diversity in the installation size (MINI, MIDI and MAXI), it was needed to consider the additional risks in HDD projects, as well as identify those risks which have not been considered in previous works. Literature study, scenario analysis, risk interviews with HDD contractors, manufacturers of HDD equipment and mud services, risk brainstorm sessions, expert surveys among HDD contractors and own observations of HDD installations supported the risk identification process. Various types of risks connected with the carrying out of HDD installations were presented. The feedback from expert surveys from 5940 HDD projects carried out in 5 countries, allowed to assess the frequency of occurrence and the influence on project failure of 38 risks in HDD technology and, therefore, proved the need to include them in the risk assessment. Additionally, the survey results allowed to assess the frequency of the occurrence of various types of problems with: the product pipe installation, rig failures, drill pipe failures, the importance of the reasons of drill rig failures and drill pipe failures. The survey results were a basis for the qualitative risk assessment which was carried out applying Ishikawa diagram.
机译:本文描述了水平定向钻探(HDD)技术中不确定性,风险和危害之间的差异。所选示例显示了HDD技术中的各种不确定性。由于HDD项目的复杂性不断提高,HDD技术的不断发展,应用各种工具和机器的可选可能性以及安装大小(MINI,MIDI和MAXI)的多样性,需要考虑HDD的其他风险项目,并确定以前工作中未曾考虑过的那些风险。文献研究,情景分析,与硬盘承包商的风险访谈,硬盘设备和泥浆服务的制造商,风险头脑风暴会议,硬盘承包商之间的专家调查以及对硬盘安装的观察都支持了风险识别过程。介绍了与执行HDD安装有关的各种风险。来自5个国家/地区的5940个HDD项目专家调查的反馈可以评估HDD技术中38种风险的发生频率以及对项目失败的影响,因此证明有必要将其纳入风险评估中。此外,调查结果还可以评估以下各种类型问题的发生频率:产品管道安装,钻机故障,钻杆故障,钻机故障原因和钻杆故障的重要性。调查结果是应用石川图进行定性风险评估的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号