...
首页> 外文期刊>Tunnel >Gloggnitz Tunnel: Material Transport with Komatsu Wheel Loaders
【24h】

Gloggnitz Tunnel: Material Transport with Komatsu Wheel Loaders

机译:Gloggnitz隧道:带小松轮装载机的材料运输

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The roughly 27 km long Semmering Base Tunnel is being built between Gloggnitz and Muerzzuschlag in three part-sections as one of the most important major European infrastructure projects. The Austrian tunnel is scheduled to be completed in 2026. The JV Hochtief Infrastructure Austria, Implenia Austria and Thyssen Schachtbau is deploying five Komatsu wheel loaders for loading at the working face and feeding the crusher in the Gloggnitz Tunnel, the eastern construction section, where they are able to prove their efficiency even under constricted conditions. The SBT 1.1 Tunnel Gloggnitz lot embraces the setting up of the two single-track bores with a total length of some 16.1 km. They are built cyclically using the NATM (New Austrian Tunnelling Method) from the Gloggnitz portal and from the Gloggnitz intermediate point of attack via six drives, connected via 16 cross-passages, a service passage and two logistics headings.
机译:大约27公里长的Semmering基础隧道正在Gloggnitz和Muerzzuschlag中建造三部分部分,作为最重要的主要欧洲基础设施项目之一。奥地利隧道计划于2026年完成.JV Hochtief基础设施奥地利,inclenia奥地利和Thyssen Schachtbau正在部署五轮装载机,用于在工作面上装载,并在他们的Gloggnitz隧道中喂养破碎机,东部建筑部分即使在收缩条件下也能够证明他们的效率。 SBT 1.1隧道Gloggnitz批次拥有两个单轨孔的设置,总长度为16.1公里。它们在Gloggnitz门户网站上使用NATM(新奥地利隧道方法)以及通过六个驱动器,通过16个交叉通道,服务通道和两个物流标题来源地使用Gloggnitz门户网站和Gloggnitz中间攻击。

著录项

  • 来源
    《Tunnel》 |2018年第3期|66-67|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号