土かぶり1.7mの国道交差点直下をハーモニカエ法でアンダーパス:国道1号 原宿交差点立体工事

机译:使用口琴法在1.7 m国道交叉口下方的地下通道:国道1原宿交叉口3D施工

获取原文
获取原文并翻译 | 示例
           

摘要

The Harajuku Intersection is the point where Route No.l crosses with the Yokohama City Ring Road No. 4located in Totsuka-ku, Yokohama City, Kanagawa Prefecture. The intersection had a many traffic of approximately 100,000 vehicles a day. It was the worst traffic jam hotspot in the refecture and congestion cost on the intersection was estimated at approximately 10 billion yen a year. This grade separation works were planned for eliminating traffic congestion (Route No.l to become underpass). This report gives information on the construction under the difficult condition that the works was executed using Harmonica Method under small cover, in urban area and near existing structures.%神奈川県横浜市戸塚区に位置する国道1号原宿交差点は,横浜市道環状4号と交差し,1日あたり約10万台の交通が利用する慢性的な渋滞交差点であり,県内渋滞ワースト1,その渋滞損失額は年間約100億円を計上する.原宿交差点立体工事は渋滞交差点を立体化(国道1号を地下へ)し,交通混雑を解消し,円滑な交通を確保することを目的に計画された.本稿では非開削工法として新技術であるハーモニカ工法を採用し,小土かぶり,都市内施工,近接施工といったきわめて難しい条件下における施工事例を報告する.
机译:原宿十字路口是1号线与神奈川县横滨市户冢区横滨市环城4号路交叉的地方,该路口每天有大约10万辆车通行,这是最糟糕的交通该县的拥堵热点和交叉路口的拥堵成本估计约为每年100亿日元。该等级分离工程计划用于消除交通拥堵(1号线成为地下通道)。困难的条件是在城市区域和现有建筑物附近使用口琴法在较小的覆盖范围内进行施工。位于神奈川县横滨市户冢区的国道1号原宿交叉路口与横滨市道路环路4号相交。这是一个慢性拥堵路口,每天使用约10万辆汽车,县内最严重的交通拥堵为1,每年的交通损失约为100亿日元。原宿十字路口的三维建设计划是为了使拥挤十字路口成为三维(国道1号地下),以消除交通拥堵并确保交通顺畅。本文采用了一种新的口琴方法作为非开挖方法,并报道了在土壤覆盖面积小,城市建设和邻近建设等极端困难条件下的实例。

著录项

  • 来源
    《トンネルと地下》 |2011年第4期|p.13-20|共8页
  • 作者单位

    国土交通省関東地方整備局横浜国道事務所;

    国土交通省関東地方整備局横浜国道事務所;

    大成建設(株)原宿立体工事作業所;

    大成建設(株)原 宿立体工事作業所;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 jpn
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号