...
首页> 外文期刊>Trenchless Technology >South Surrey Interceptor Johnston Road Section - Phase 2Trenchless Segment
【24h】

South Surrey Interceptor Johnston Road Section - Phase 2Trenchless Segment

机译:南萨里拦截机约翰斯顿路段-第二阶段无节段

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

South Surrey Interceptor (SSI) Phase 2 Johnston Road is a twinning project to increase sewer conveyance capacity in Surrey, British Columbia. The SSI collects sewage from South Surrey and Langley, and conveys it to the Annacis Island Wastewater Treatment Plant. The two-phase, (US)$14 million South Surrey Interceptor (SSI) appears to be the largest diameter microtunnel project completed to date in North America, at a 3.68-m machine diameter. The project illustrates how microtunneling can be successfully used to efficiently complete large diameter curved pipeline installations in urban areas, while minimizing disturbance and environmental impacts.
机译:South Surrey Interceptor(SSI)第二阶段Johnston Road是一个孪生项目,旨在提高不列颠哥伦比亚省Surrey的污水输送能力。 SSI从南萨里和兰里收集污水,并将其输送到安纳西斯岛废水处理厂。这项耗资1400万美元的分两阶段进行的South Surrey拦截器(SSI)似乎是迄今为止北美最大直径的微型隧道项目,其机器直径为3.68米。该项目说明了如何将微隧道技术成功地用于高效完成市区大直径弯管的安装,同时最大程度地减少干扰和环境影响。

著录项

  • 来源
    《Trenchless Technology》 |2019年第10期|26-26|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号