...
首页> 外文期刊>Trenchless Technology >The Big Fix: San Diego's Sewer Renewal Program
【24h】

The Big Fix: San Diego's Sewer Renewal Program

机译:大修复:圣地亚哥的下水道更新计划

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even the pyramids are showing their age. San Diego is not immune to deteriorating infrastructure, but the city is aggressively dealing with its aging sewer system. San Diego's Metropolitan Wastewater Department has developed a plan to rehabilitate a majority of its sewers over a 50-year period. The ambitious program is already well under way, with more than 200 miles of the 3,000-mile system rebuilt or newly lined.
机译:如果基础设施永远持续下去,公共工程管理将很容易。它不是。道路,桥梁和下水道最终会磨损。连金字塔都在显示自己的年龄。圣地亚哥无法幸免于基础设施不断恶化,但该市正积极应对其老化的下水道系统。圣地亚哥的大都市污水部门制定了一项计划,以在50年内修复其大部分下水道。这个雄心勃勃的计划已经很好地进行了,在3,000英里的系统中,超过200英里进行了重建或重新铺设衬砌。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号